The building works are to be inspected during construction by the Council, and accredited certifier or other suitably qualified person/s (as applicable) and a Compliance Certificate shall be issued prior to proceeding to the subsequent stages of construction, encompassing not less than the following stages:
- Any pier holes and/or foundation material.
- Any steel reinforcement prior to placement of concrete. This includes all reinforcement of floor, slabs, trenches, columns, beams and stairs (if components of this structure).
- Any structural components (i.e. timber framework, structural steelwork or the like) before fixing and lining or covering.
- Any stormwater drainage works prior to covering.